01 — Scope

What we build for energy & power

Send a drawing and a target quantity. We will come back with material, process and a realistic date, or tell you what we would change first.

Table 1 — Energy & power prototyping scope
Parameter Value
Typical parts Busbars and connectors · Liquid cooling manifolds · Heat exchanger blocks · Insulator mounts
Common materials Al 6061 · Copper · SS 316L · PEEK · PMMA
Achievable tolerance ±0.05 mm typical, flatness to 0.02 mm on sealing faces
Typical lead time 6–12 working days
Industry requirements ISO 9001 quality systems at partner factories · Material certification per lot · Internal passage inspection with photos · NDA available
02 — Engineering challenges

What actually goes wrong in energy & power

These are the three problems that decide whether a energy & power prototype succeeds or gets scrapped on arrival.

01

Sealing surface flatness

A coolant or gas seal depends on flatness across the joint, not on the general tolerance. This is the number that decides whether the thermal test is valid.

02

Internal channel finishing

Channels and galleries have to be deburred and cleaned, because a burr inside a coolant path will either block flow or shed particles. Blind and internal passages are the hard part of the job.

03

Conductivity versus machinability

Copper conducts far better than aluminium but is heavier, softer and more expensive. The right choice depends on the current and the thermal path, and we will lay out the trade-off.

03 — How we work

Our approach on energy & power parts

  1. 01 We machine sealing faces in a single setup and check flatness against a granite surface plate.
  2. 02 Internal passages are deburred and photographed before the part ships, so you can verify them yourself.
  3. 03 For a busbar we review current density, thermal path and mounting before the material is chosen.
04 — At a glance

The numbers that matter

0.02 mm sealing flatness
6–12 d typical lead time
5-axis internal channel geometry
06 — What this prototype does not prove

Where a prototype stops short

A prototype answers geometry and fit. It does not qualify a product, and we will not pretend otherwise. These are the questions that need a test programme.

  • Thermal performance over a full duty cycle
  • Dielectric strength or electrical isolation, unless it was specified
  • Leak-tightness across the whole operating range
Next step

Send your STEP file. Get a quote within 24 hours.

An engineer reviews your drawings and replies with DFM advice and a formal quote — no account needed.

Partner factory
Partner factory
Partner factory
DIN / ISO 2768-m / f · CMM reports available
WhatsApp