Twelve materials, and the argument for each one

A material page here is not a brochure. It records what the material does when you cut it, what tolerance it holds after it moves, and where a different alloy would have been the better call. Where a grade is not stocked, we say so and confirm before quoting.

Material comparison

Table 1 — Machinability, tolerance and lead time by material
Material Machinability Achievable tolerance Lead time Typical use
Aluminum 6061 Excellent ±0.05 mm on critical features, ±0.10 mm typical 3–7 working days Enclosures, heat sinks, fixtures, brackets, housings
Aluminum 7075 Good ±0.05 mm on critical features 4–8 working days Aerospace brackets, robot links, load-bearing fixtures
316 Stainless Steel Fair ±0.05 mm achievable with care 5–9 working days Medical instruments, marine fittings, chemical parts
304 Stainless Steel Fair ±0.05 mm achievable with care 5–9 working days General brackets, food-contact parts, housings
Grade 5 Titanium Difficult ±0.05 mm achievable, cost rises sharply below that 7–12 working days Lightweight structural parts, medical implants, aerospace hardware
PEEK Fair ±0.05 mm achievable on filled grades, ±0.10 mm typical 7–12 working days High-temperature insulators, seals, semiconductor and medical components
POM Excellent ±0.05 mm achievable, ±0.10 mm typical 3–6 working days Bearings, rollers, precision slots, gears, bushings
Nylon PA Fair ±0.10 mm typical, needs conditioning time 3–6 working days Gears, bushings, wear strips, electrical insulating parts
Brass Excellent ±0.05 mm achievable 3–6 working days Connectors, RF parts, inserts, valve components
Copper Good ±0.05 mm achievable 4–7 working days Busbars, heat spreaders, RF shielding, electrodes
ABS Good ±0.10 mm typical, ±0.05 mm on critical features 3–6 working days Housings, brackets, enclosures, snap-fit covers
Polycarbonate (PC) Fair ±0.10 mm typical 4–7 working days Transparent covers, guards, lenses, housings, fixtures

All materials

Aluminum 6061

Excellent

The default prototype alloy — easy to machine, stable, and the only one most prototype drawings should start from.

Typical use
Enclosures, heat sinks, fixtures, brackets, housings
Tolerance
±0.05 mm on critical features, ±0.10 mm typical
Lead time
3–7 working days
Read the machining notes

The strength option — roughly twice the yield of 6061, at a real cost in corrosion resistance and machining.

Typical use
Aerospace brackets, robot links, load-bearing fixtures
Tolerance
±0.05 mm on critical features
Lead time
4–8 working days
Read the machining notes

The medical and marine grade — better chloride resistance than 304, and harder to cut because of it.

Typical use
Medical instruments, marine fittings, chemical parts
Tolerance
±0.05 mm achievable with care
Lead time
5–9 working days
Read the machining notes

The general-purpose stainless — the right answer unless the environment is chloride-heavy or the part is welded.

Typical use
General brackets, food-contact parts, housings
Tolerance
±0.05 mm achievable with care
Lead time
5–9 working days
Read the machining notes

Grade 5 Titanium

Difficult

High strength, low density, and a cutting cost that has to be planned for rather than discovered.

Typical use
Lightweight structural parts, medical implants, aerospace hardware
Tolerance
±0.05 mm achievable, cost rises sharply below that
Lead time
7–12 working days
Read the machining notes

PEEK

Fair

The high-performance polymer — chemically inert and heat resistant, and a machining problem until the tooling strategy is right.

Typical use
High-temperature insulators, seals, semiconductor and medical components
Tolerance
±0.05 mm achievable on filled grades, ±0.10 mm typical
Lead time
7–12 working days
Read the machining notes

POM

Excellent

Dimensionally stable, low friction and easy to machine — until you try to bond it to anything.

Typical use
Bearings, rollers, precision slots, gears, bushings
Tolerance
±0.05 mm achievable, ±0.10 mm typical
Lead time
3–6 working days
Read the machining notes

Nylon PA

Fair

Tough and easy to machine, but it moves after you cut it — moisture, not the machining, is what changes the dimension.

Typical use
Gears, bushings, wear strips, electrical insulating parts
Tolerance
±0.10 mm typical, needs conditioning time
Lead time
3–6 working days
Read the machining notes

Brass

Excellent

Machines beautifully and holds a fine finish — with one corrosion trap worth knowing about.

Typical use
Connectors, RF parts, inserts, valve components
Tolerance
±0.05 mm achievable
Lead time
3–6 working days
Read the machining notes

Copper

Good

Excellent thermal and electrical conductor, and one of the harder metals to machine cleanly because it is soft and gummy.

Typical use
Busbars, heat spreaders, RF shielding, electrodes
Tolerance
±0.05 mm achievable
Lead time
4–7 working days
Read the machining notes

ABS

Good

The general-purpose enclosure material — impact resistant, bonds well, and machines with a slightly rough surface that needs attention.

Typical use
Housings, brackets, enclosures, snap-fit covers
Tolerance
±0.10 mm typical, ±0.05 mm on critical features
Lead time
3–6 working days
Read the machining notes

Tough and optically clear, with one failure mode that catches almost every first-time machinist.

Typical use
Transparent covers, guards, lenses, housings, fixtures
Tolerance
±0.10 mm typical
Lead time
4–7 working days
Read the machining notes

Tolerances above are for a single prototype part. Volume pricing, certification and material availability change the picture — send the drawing and we will confirm the grade before quoting.

Next step

Send the drawing. We will tell you if the material is wrong.

Material selection is where prototype budgets are won or lost. An engineer reviews the drawing, checks the alloy against the duty, and flags a cheaper or stronger option before the quote is written.

Partner factory
Partner factory
Partner factory
DIN / ISO 2768-m / f · CMM reports available
WhatsApp