2-HOUR FIRST RESPONSE QUOTE IN 24 HOURS NDA AVAILABLE ON REQUEST
Material

Nylon PA

Tough and easy to machine, but it moves after you cut it — moisture, not the machining, is what changes the dimension.

Absorbs moisture from the air and keeps growing afterwards. Parts are measured in a conditioned state, and we note it on the drawing review.

Quote a Nylon PA part
01 — Specification

What we hold and what we can hold

Figures below are what our shops achieve on prototype quantities. A production order may justify tighter — or looser — tolerances, and that is a conversation, not a default.

Table 1 — Nylon PA machining specification
Property Value
Typical use Gears, bushings, wear strips, electrical insulating parts
Machinability Fair
Achievable tolerance ±0.10 mm typical, needs conditioning time
Typical lead time 3–6 working days
Common grades PA6 · PA6-GF30 · PA66 · PA12
Recommended finishes Deburring · Bead blasting
Suitable processes 3-axis milling · CNC turning
02 — Engineering questions

What engineers ask about Nylon PA

These are the questions that come up on almost every Nylon PA drawing. If your question is not here, send it with the drawing and we will answer it in the quote.

Why did my nylon part fail a bore tolerance after delivery?

Almost always moisture. Nylon absorbs humidity and continues to change dimension after machining. We condition the stock before cutting and specify the conditioning state on the inspection report.

Does nylon need an anneal step?

Yes for large or critical parts, to relieve the stress that machining leaves in the material. We flag it when the tolerance is tighter than the material can hold reliably.

03 — Related

Where this material fits

04 — Where this is the wrong choice

When not to use Nylon PA

We would rather tell you on day one than ship you a part that was never the right answer. If one of these applies to your project, say so in the enquiry.

  • Tight-tolerance features without conditioning and an anneal step
  • Moisture exposure where dimension drift after delivery is unacceptable
  • Parts that must be bonded — nylon needs a mechanical or welded joint
Next step

Send your STEP file. Get a quote within 24 hours.

An engineer reviews your drawings and replies with DFM advice and a formal quote — no account needed.

Partner factory
Partner factory
Partner factory
DIN / ISO 2768-m / f · CMM reports available
WhatsApp